Introductions
This course, held over three days, is aimed at teaching best practice design principles for the design, construction and operation of computer rooms and data centers. It consists of a number of subsections that address the fundamental requirements of a successful design such as electrical power supply, air conditioning, airflow management and data cabling. Best practice is achieved by bringing together the requirements of Building Regulations, Statutory Instruments, and E.U. Directives, British, European and International standards. Several case studies are considered to see examples of good and bad practice in real situations. The unit is principally assessed by an ongoing design exercise that leads the delegates through all the steps needed to arrive at a baseline design of a modern data Centre. All the Data Centre Courses have been fully updated to take into account the requirements of the 2009 EU Code of Conduct on Data Centers Energy Efficiency.
Nbiz Infosol provides this course in UAE specifically in Abu Dhabi, Dubai, Ajman, RAK, Al Ain, Umm Al Quwain and other areas
Course Objectives
To understand the best practice of design principles, construction, operation and ongoing management of computer rooms and data Centre’s Ensuring they are efficient and compliant.
Prerequisites
- Experience of the data Centre environment is essential.
Duration & Learning Level
Learning Level: Intermediate
Duration: 3day(s)
<<Back to schedule | |||
Training Provider | Nbiz Infosol | Course Name | |
Candidate Name * | Company Name | ||
Student Type | Student Type ID | ||
Student ID Number | Mobile # * | ||
Email* | Registration Ref | ||
Name of Course | Scheduled Dates | Venue | Registration Link |
Certified Data Center Design CDCD | To be determined | Abu Dhabi, UAE | Register Now »» |
Certified Data Center Design CDCD | To be determined | Dubai, UAE | Register Now »» |
Certified Data Center Design CDCD | To be determined | Chennai, India | Register Now »» |
Certified Data Center Design CDCD | To be determined | Manama, Bahrain | Register Now »» |
Certified Data Center Design CDCD | To be determined | Cairo, Egypt | Register Now »» |
Certified Data Center Design CDCD | To be determined | Tehran, Iran | Register Now »» |
Certified Data Center Design CDCD | To be determined | Alexandria, Egypt | Register Now »» |
Certified Data Center Design CDCD | To be determined | Baghdad, Iraq | Register Now »» |
Certified Data Center Design CDCD | To be determined | Kuwait City, Kuwait | Register Now »» |
Certified Data Center Design CDCD | To be determined | Abu Dhabi, UAE | Register Now »» |
Certified Data Center Design CDCD | To be determined | Beirut, Lebanon | Register Now »» |
Certified Data Center Design CDCD | To be determined | Doha, Qatar | Register Now »» |
Certified Data Center Design CDCD | To be determined | Riyadh, Saudi Arabia | Register Now »» |
Certified Data Center Design CDCD | To be determined | Jeddah, Saudi Arabia | Register Now »» |
Certified Data Center Design CDCD | To be determined | Abu Dhabi, UAE | Register Now »» |
Nbiz delivers this course in Abu Dhabi, Dubai, RAK, Ajman, Sharjah, Kuwait, Oman, Saudi, Bahrain , egypt and other places in the UAE and in the Middle East
Learn how to scope, plan and implement a Data Centre design Utilising current industry best practices and applicable standards Able too meet the ever expanding demands of today’s modern business environment
Day 1
Introduction
- TIA 942 and European standards
- TIA 942 spaces and hierarchical model
- Example projects and Costing
- Size of market
- Intro to Uptime Model of Tiering
Facilities and location
- TIA 942 recommendations for location, size, heights, floor loading lighting and raised floors
- Audits of designs
- Emergency lighting and signage
- Services and facilities
Raised floor design
- TIA 942 recommendations (PSA) Method of Building Performance Specification‘ Platform Floors (Raised Access Floors)’, MOB PF2 PS
- BS EN 12825:2001
- Calculating floor height Ramps and the Disability Discrimination Act
- Earthing and bonding
Day 2
Rack location
- TIA 942 and ASHRAE recommendations
- Hot aisle/cold aisle model
- 7-tile pitch model
- Under floor plenum air distribution
- What makes a rack a server rack?
- 4-post and 2-post systems
- Using tools like Visio and Net zoom
Power supplies
- Some electrical principles, volts, amps, watts, kVA, power factor and three phase
- Electrical distribution codes
- Power density
- TIA 942 requirements
- TIA 942 Tiers
- The meaning of N, N+1 2(N+1) etc
- Estimating power requirements
- Uninterruptible Power Supply (UPS) options
- Power distribution to and in a rack
- Power Distribution Units requirements of TIA 942
- Pre-action sprinkler system
- Approved gaseous fire suppression chemicals (clean agent)
- Smoke detector selection
- Aspirating smoke detectors (VESDA)
- BS 5839 requirements for fire detecting
- ‘L’ and ‘M’ categories
- Sitting of fire & smoke detectors
- NFPA 75 requirements
- Cables for smoke detectors and alarm Systems
Day 3
Fire – cabling
- Fuel loads of different cable materials
- American building codes
- The riser and plenum grade of cable
- NFPA 262
- Limited Combustible cables
- European Directives
- The Construction Products Directive
- European fire tests and standard
- Insurance perspectives
- Comparing US and European specs
- Relative costs
- Cooling
- Basics of air conditioning principles
- Comfort vs. precision air conditioning
- TIA 942 requirements
- Fresh air and ventilation Requirements
- Power consumption of air Conditioning
- Air conditioning options
- Under floor plenum approach
- Hot aisle/cold aisle model
- The limiting factors for free Cooling of racks via floor vents
- Fan assisted floor vents and fan assisted racks
- Min and max throw distances For under floor air
- Side to side cooling
- Upgrade paths
- Chilled water racks, CO2, Passive Air
- Testing
- TIA 942 Tiering for HVAC
Earthing
- Applicable standards
- The terminology of earthing, grounding and bonding
- Equi potential bonding
- Functional earths
- TIA 942 requirements
- The Signal Reference Grid (SRG)
- SRG spacing and connection
Cable containment
- Applicable standards
- Separation of power and data cables to EN 50174and BS 6701 and TIA 942
- Types of conduit, trunking, tray etc.
- Fill rules
- Cable management in and to a rack
- Fire stopping
- Earthing and bonding
This is an advanced learning level course which consists of a 3 days duration.
The participant will be entitled for a certification of Certified after completing of his/her training successfully.
1. How do I enroll/register for the training course?
To enroll or register to any training course, you can use the registration page from training page or fill the request a call back form from each course pages.
The following page will provide you a list of course and training that we are providing based on the category and from each course item you can see the course details.
URL: http://www.nbizinfosol.com/training.aspx
Another method is to fill a Request a call back form provided in each Training/Course pages.
2. What will I get along with this training?
We are providing course materials during training and completion certificate after succesful training.
3. Do I need to fill up a registration form?
Yes. you can fill the registration form avaialble in the website or you can directly call us to enroll the course.Our executives will guide you to do further steps.
4. Does the course fees include the examination fee as well?
Based upon the course you are enrolling, we will charge the exam fee . We will give you the details of course fee and exam fee anytime to clear it.
5. Do you provide any course completion certificate?
Yes. We are providing the Course completion certificate for all courses we are providing.
6. Do you provide assistance for the exam appliation process?
Yes. We will provide assistance and support to apply for any exam.
7. What is the mode of payment?
Two types of payment available:
1. Visit our office and pay direct,You are always welcome to Nbizinfosol.
2. We are providing online payment via paypal payment gateway.Based upon your request we will provide the link to access the payment page.
Any individual involved or responsible for the management of data centre’s Data Centre Engineers
Note: The listed information (venue, schedule, duration and content) may be modified and customized as per the requirements.